Retrospective Consent: for existing Line now subject to Section 37 consent: High Voltage overhead supported by wooden poles, between NK 0311458462 and NK 0340858431 Located within…
Section 37 consent: High Voltage overhead supported by wooden poles, between NJ 46045 12926 and NJ 46330 12886 Located within the Planning Authority Area of ABERDEENSHIRE &…
This project comprises the construction of a new 33kV overhead line spur. The new line will consist of four new poles consisting of three single and one double, which will house…
SSEN propose a new 33kV overhead line to increase the capacity required to facilitate electric ferry chargers at Colintraive Ferry Terminal. The new 33kV overhead line spur will…
The Proposed Development is seeking to construct a 1.4km section of OHL to the already consented Bhlaraidh Extension Wind Farm Grid Connection routed between the proposed…
The Proposed Development will comprise up to 16 wind turbines, each up to 200 m blade tip height, as well as associated infrastructure. Its total generating capacity is…
Onshore wind farm proposed inland of Tayinloan within commercial forestry.
Construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch…
The Proposed Development will consist of the construction and operation of an up to 100 MW Battery Energy Storage System (BESS).
The Proposed Development will consist of the construction and operation of an up to 150MW Battery Energy Storage System (BESS).
132kV wood pole overhead line, approximately 16km long between Sclenteuch wind farm substation and Coylton substation, in East Ayrshire.
The Proposed Development will consist of the construction and operation of an up to 400MW Battery Energy Storage System (BESS).
To install an 11KV overhead line approximately 0.3km long, supported on 3 wood poles together with all necessary ancillary works. The proposed line will replace an existing 11KV…
Request for EIA Screening Opinion relating to an Battery Energy Storage System (BESS) Development at Land to the east of Muckraw Farm, Westfield, West Lothian
33Kva Over Headline spur in Ardvourlie, Isle of Harris. This new line would consist of 2 new spans in total, for a length of approx. 46.36 Meters. The line would consist of 2…
S36 APPLICATION FOR THE CONSTRUCTION AND OPERATION OF AN ENERGY GENERATING SYSTEM, WHICH WILL COMPRISE A BATTERY ENERGY STORAGE SYSTEM WHICH WILL STORE UP TO 400MW OF ENERGY…
S36 APPLICATION FOR THE CONSTRUCTION AND OPERATION OF AN ENERGY GENERATING SYSTEM, WHICH WILL COMPRISE A BATTERY ENERGY STORAGE SYSTEM WHICH WILL STORE UP TO 150MW OF ENERGY…
20 turbines with a maximum 200 m tip height, with an installed capacity of up to 144MW, and associated infrastructure. Potential Battery Energy Storage System with an indicative…