This project comprises the construction of a new 33kV overhead line spur. The new line will consist of four new poles consisting of three…

33kV OHL at Allt Coire Chruitein, Auch Estate, Bridge of Orchy, Argyll

Official description

This project comprises the construction of a new 33kV overhead line spur. The new line will consist of four new poles consisting of three single and one double, which will house our plant and equipment. The new overhead line will be installed using poles of a wooden variety and these will be approximately 10 metres in height. The total length of the overhead line will be 27.50m. From Pole 2 of the new spur we propose to install approximately 1080m of 33kv underground cable to a single free standing pole, followed by 30m of service cable to the point of connection. The underground cable is classed as permitted development.

Council
Energy Consents Unit
Reference
ECU00006372
Application type
Screening
Status
Complete
Decision
Permitted
Submitted
2 Apr 2026
Decision date
24 Apr 2026
View the official council record

More applications in Energy Consents Unit

Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…

Albusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006506
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…

Rufusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006507
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…

Flavusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006505
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…

Innerwick StorageSubmitted 28 Oct 2026Updated 8 days agoECU00006498
Energy Consents UnitScreeningApplication

Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.

DG Route tie-inSubmitted 21 Oct 2026Updated 15 days agoECU00006391
Energy Consents UnitDevelopmentConsultation

The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…

Brevig Harbour ReconductoringSubmitted 23 Sep 2026Updated 1 month agoECU00006427