SSEN propose a new 33kV overhead line to increase the capacity required to facilitate electric ferry chargers at Colintraive Ferry…
New 33kV tee off The Ferry Terminal, Colintraive
Official description
SSEN propose a new 33kV overhead line to increase the capacity required to facilitate electric ferry chargers at Colintraive Ferry Terminal. The new 33kV overhead line spur will come from pole 143 of the Clachaig Village circuit. The overhead line will consist of 2 single poles, 2 double poles and 3 span of 33kV conductor. The total length of the overhead line will be 30m. The poles will house our plant equipment and a number of these will also have stay wires attached. The poles will be 11m in height.
- Council
- Energy Consents Unit
- Reference
- ECU00006369
- Application type
- Screening
- Status
- Complete
- Decision
- Permitted
- Submitted
- 27 Mar 2026
- Decision date
- 30 Jun 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…