Section 37 consent: High Voltage overhead supported by wooden poles, between NJ 46045 12926 and NJ 46330 12886 Located within the Planning…
Scottish Hydro Electric Power Distribution Notification for Retrospective Section 37 Consent On Overhead Line at Nethermill Steading, Glenkindie, Alford
Official description
Section 37 consent: High Voltage overhead supported by wooden poles, between NJ 46045 12926 and NJ 46330 12886 Located within the Planning Authority Area of ABERDEENSHIRE & Nethermill Steading, Glenkindie, Alford, Aberdeenshire, AB33 8SH
- Council
- Energy Consents Unit
- Reference
- ECU00006373
- Application type
- Development
- Status
- Consented
- Decision
- Permitted
- Submitted
- 6 Apr 2026
- Decision date
- 16 Jun 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…