The Proposed Development is seeking to construct a 1.4km section of OHL to the already consented Bhlaraidh Extension Wind Farm Grid…
LT294/295 Bhlaraidh Extension Wind Farm Grid Connection Works
Official description
The Proposed Development is seeking to construct a 1.4km section of OHL to the already consented Bhlaraidh Extension Wind Farm Grid Connection routed between the proposed Bhlaraidh Extension Wind Farm on-site substation and Fort Augustus substation. This new section of OHL would connect into the OHL alignment consented under ECU00004639.
- Council
- Energy Consents Unit
- Reference
- ECU00006368
- Application type
- Screening
- Status
- Pre Application Complete
- Decision
- Permitted
- Submitted
- 26 Mar 2026
- Decision date
- 9 Jul 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…