Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…
Build four electricity pylons, remove one existing pylon and temporarily divert power lines to connect the ZCS route to a new substation.
Increase the operating voltage of the 10.5km long section of overhead line between the downleads at tower XL001A, grid reference NS92348823 and mid span beyond XL033 at…
The Project comprises of construction of a new 33kV overhead line spur in order to provide a new connection for a new telecoms mast site situated at Land near Bridge of Balgie…
Retrospective Consent for existing Line now subject to Section 37 consent: Seven spans of High Voltage overhead supported by wooden poles,
Reinforcement scheme for Skulamus to increase network security and local electricity on the southern and central areas of the Isle of Skye. Approximately a 20km OHL route going…
The Proposed Development involves a new substation, approximately 16 km of underground electricity cable (UGC), diversion and tie-in to the existing Beauly-Denny overhead line…
Build four electricity pylons, remove one existing pylon and temporarily divert power lines to connect the ZCN route to a new substation.
Build up to eight wind turbines, a 60-hectare solar farm and battery storage within a substation compound.
Add an extra wire to an existing overhead electricity line to upgrade its power supply.
Build a short overhead power line with new poles to increase electricity capacity for ferry chargers at Colintraive.
Install two wooden poles, a transformer and 37 metres of overhead electricity line, with underground cables connecting a battery storage site.
Install two wooden poles, a transformer and 18 metres of overhead electricity line, with underground cables supplying a telecommunications mast.
Rebuild 260 metres of overhead electricity line south of Coldstream, covering five poles and six supporting wires in Scotland.
Replace the electricity pole where the Cour Cottages overhead connection branches from the main line.