Build up to eight wind turbines, a 60-hectare solar farm and battery storage within a substation compound.
Auchinoon Energy Park
Trades this could involve
Official description
It is currently anticipated that the proposed development would consist of up to eight wind turbines with a tip height of up to 200m and a solar PV array covering approximately 60ha. It is also currently proposed to include a battery energy storage system (within the substation compound) for load shifting i.e. not for grid export.
- Council
- Energy Consents Unit
- Reference
- ECU00006339
- Application type
- Scoping
- Status
- Pre Application Complete
- Decision
- Permitted
- Submitted
- 19 Aug 2026
- Decision date
- 19 Aug 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…