Install two wooden poles, a transformer and 37 metres of overhead electricity line, with underground cables connecting a battery storage site.

Patrickston Solar Farm, Kippen

Trades this could involve

GroundworkerElectrical Contractor (Commercial)

Official description

Proposal to construct a new OHL spur in order to provide a new connection for a BESS site. The new line will consist of 2 new single poles which will house our plant equipment and transformer. The new OHL will be installed using poles of a wooden variety and these will be no more than 12 metres in height. The total length of the overhead line will be 37 metres. From Pole 156 on the current spur, we propose to install approx. 37m of 33kV overhead cable, moving down into underground mains cable and service cable, which will terminate at the customer connection point. The cable route will be classed as permitted development and is not detailed in the plan. As this line is to be constructed away from the main road there will be no requirement for traffic management, supplies will be stored in our local depot yard in Perth.

Council
Energy Consents Unit
Reference
ECU00006455
Application type
Development
Status
Application
Submitted
4 Aug 2026
View the official council record

More applications in Energy Consents Unit

Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…

Albusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006506
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…

Rufusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006507
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…

Flavusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006505
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…

Innerwick StorageSubmitted 28 Oct 2026Updated 8 days agoECU00006498
Energy Consents UnitScreeningApplication

Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.

DG Route tie-inSubmitted 21 Oct 2026Updated 15 days agoECU00006391
Energy Consents UnitDevelopmentConsultation

The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…

Brevig Harbour ReconductoringSubmitted 23 Sep 2026Updated 1 month agoECU00006427