Increase the operating voltage of the 10.5km long section of overhead line between the downleads at tower XL001A, grid reference NS92348823…

Central Scotland 400kV Upgrade (XL Route)

Official description

Increase the operating voltage of the 10.5km long section of overhead line between the downleads at tower XL001A, grid reference NS92348823 and mid span beyond XL033 at Blairingone, grid reference NS98309677, from 275 to 400 kilovolts (kV) to enable an increase in its capacity; Reconductor (i.e. changing the wires) between towers XL12 and XL20 as part of increasing the operating voltage of XL route; Construct four new overhead line towers to turn in and connect XL route to the proposed Kincardine North Substation; Remove one existing overhead line tower (XL05); and Install temporary masts to divert one circuit of XL route to enable construction of towers and removal of existing tower. Associated access works, scaffolding, working areas, laydown areas and pulling positions for conductors.

Council
Energy Consents Unit
Reference
ECU00006463
Application type
Development
Status
Consultation
Submitted
23 Sep 2026
View the official council record

More applications in Energy Consents Unit

Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…

Albusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006506
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…

Rufusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006507
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…

Flavusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006505
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…

Innerwick StorageSubmitted 28 Oct 2026Updated 8 days agoECU00006498
Energy Consents UnitScreeningApplication

Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.

DG Route tie-inSubmitted 21 Oct 2026Updated 15 days agoECU00006391
Energy Consents UnitDevelopmentConsultation

The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…

Brevig Harbour ReconductoringSubmitted 23 Sep 2026Updated 1 month agoECU00006427