The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing…
Brevig Harbour Reconductoring
Official description
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD copper conductors supported across eight poles. The overhead line section referenced in this notification is approximately 0.68 km in length and provides the connection between the 11 kV cable at existing Pole P7 and the existing Brevig Harbour Ring Main Unit (RMU).
- Council
- Energy Consents Unit
- Reference
- ECU00006427
- Application type
- Development
- Status
- Consultation
- Submitted
- 23 Sep 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
Build four electricity pylons, remove one existing pylon and temporarily divert power lines to connect the ZCS route to a new substation.