Build five wind turbines alongside solar panels, battery storage and supporting infrastructure near Lockerbie.

Howat's Hill Wind Farm

Trades this could involve

GroundworkerSolar InstallerElectrical Contractor (Commercial)

Official description

The Development includes a wind farm consisting of 5 turbines (total capacity of c. 33.5 MW), with co-located solar (c. 25 MW) and a battery energy storage system (c. 10 MW) plus ancillary infrastructure. The Development would be temporary and reversible, with an operational timeframe of approximately 40 years. The Site is located approximately 7.7 km south-east of Lockerbie and 2 km north-west of Waterbeck village in Dumfries and Galloway.

Council
Energy Consents Unit
Reference
ECU00006443
Application type
Scoping
Status
Pre Application Complete
Decision
Permitted
Submitted
9 Jul 2026
Decision date
13 Oct 2026
View the official council record

More applications in Energy Consents Unit

Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…

Albusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006506
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…

Rufusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006507
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…

Flavusia BESSSubmitted 30 Oct 2026Updated 6 days agoECU00006505
Energy Consents UnitScreeningConsultation

Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…

Innerwick StorageSubmitted 28 Oct 2026Updated 8 days agoECU00006498
Energy Consents UnitScreeningApplication

Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.

DG Route tie-inSubmitted 21 Oct 2026Updated 15 days agoECU00006391
Energy Consents UnitDevelopmentConsultation

The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…

Brevig Harbour ReconductoringSubmitted 23 Sep 2026Updated 1 month agoECU00006427