Build a large solar farm with battery storage, substations, underground cables, access tracks, security fencing and landscaping.
Halfway Energy Park
Trades this could involve
Official description
The construction and operation of up to 500MW ground-mounted solar PV farm together with up to 100MW co-located BESS and associated infrastructure including inverter/transformer stations, substations (including Site substation and Transmission Operator Grid substation), underground cabling, access tracks, temporary construction compounds, security fencing, CCTV, landscaping, and biodiversity enhancements.
- Council
- Energy Consents Unit
- Reference
- ECU00006442
- Application type
- Scoping
- Status
- Pre Application
- Submitted
- 7 Jul 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…