Change an existing overhead power line from serving one user to serving multiple users, with no physical works described.
Glendronach Distillery, Forgue, Huntly, AB54 6DB
Official description
Existing single user overhead line will now be multi-use overhead line.
- Council
- Energy Consents Unit
- Reference
- ECU00006439
- Application type
- Development
- Status
- Consented
- Decision
- Permitted
- Submitted
- 8 Jul 2026
- Decision date
- 18 Aug 2026
- Postcode
- AB54 6DB
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…