Install approximately 36 kilometres of overhead power line and 1.72 kilometres of underground cable connecting three substations.
Redshaw to Hagshaw Tee to Bankend Rig III Substation Overhead Line Grid Connection
Trades this could involve
Official description
A new 132kV single circuit overhead line (OHL), approximately 36km in length with approximately 1.72km of underground cable (UGC) to run from Redshaw Substation to the proposed Bankend Rig III substation via the provision of a connection to Hagshaw Hill Repowering Phase 3 substation
- Council
- Energy Consents Unit
- Reference
- ECU00006437
- Application type
- Scoping
- Status
- Pre Application Complete
- Decision
- Permitted
- Submitted
- 29 Jun 2026
- Decision date
- 5 Oct 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…