Propose to tee off from P18 on the existing 11kv Overhead Line and build a 9 span 11kv spur as part of reinforcement works to the network…
Proposal to Build a New 11kv High Voltage Overhead Line Spur as Part of Reinforcement Works to the Network at Achurail Junction, Rogart
Official description
Propose to tee off from P18 on the existing 11kv Overhead Line and build a 9 span 11kv spur as part of reinforcement works to the network. We will erect 9 single poles and 6 associated Stay Wires (one each on P18, P3, P4 & P7 and two on P9), installing a transformer on P9.
- Council
- Energy Consents Unit
- Reference
- ECU00006433
- Application type
- Development
- Status
- Consented
- Decision
- Permitted
- Submitted
- 23 Jun 2026
- Decision date
- 30 Sep 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…