This project comprises the construction of a new 33kV overhead line spur. The new line will consist of two single poles, which will house…
33kV OHL at Inverleiver Argyll
Official description
This project comprises the construction of a new 33kV overhead line spur. The new line will consist of two single poles, which will house our plant and equipment. The new overhead line will be installed using poles of a wooden variety and these will be approximately 10 metres in height. The total length of the overhead line will be 30m. From Pole 2 of the new spur we propose to install approximately 20m of HV cable followed by 30m of service cable to the point of connection. This will be classed as permitted development.
- Council
- Energy Consents Unit
- Reference
- ECU00006389
- Application type
- Development
- Status
- Consented
- Decision
- Permitted
- Submitted
- 30 Apr 2026
- Decision date
- 24 Jun 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…