The Project comprises of the construction of a new 33kV overhead line to provide both a new supply & export of electricity to a new solar…
new 33kV tee off Glenkiln Farm, Isle of Arran
Official description
The Project comprises of the construction of a new 33kV overhead line to provide both a new supply & export of electricity to a new solar facility at Glenkiln Farm. The new 33kV overhead line will tee off from a new pole on the Arran North cable circuit. The overhead line will consist of 16 single poles, 1 double pole and 16 span of 33kV conductor. The total length of the overhead line will be 1191m. The poles will house our plant equipment and a number of these will also have stay wires attached. The poles will range between 9m & 13m in height.
- Council
- Energy Consents Unit
- Reference
- ECU00006370
- Application type
- Screening
- Status
- Pre Application
- Submitted
- 27 Jul 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…