The application relates to the Scottish Power Distribution SP94413 Armadale 11kV Overhead Line circuit re-build. The line is located north…
SP94413 Armadale Rebuild
Official description
The application relates to the Scottish Power Distribution SP94413 Armadale 11kV Overhead Line circuit re-build. The line is located north of Armadale and Bathgate in West Lothian and is 8.4km in length including spurs, 3.9km of which is being submitted under S37, with the tallest pole being 13m in height. The circuit re-build includes diverting sections of the existing line as outlined in the attached route maps (red = proposed and grey = existing). The sections of line deviation amount to approximately 3.9km and represent areas being submitted under S37. The entire line Deviation points are as follows: Point A Grid Ref. NS953687 - NS946697 Point B Grid Ref. NS940699 - NS938700 Point C Grid Ref. NS945716 - NS952723 Point D Grid Ref. NS957700 - NS962694 Point E Grid Ref. NS952706 - NS955703 The work requires removal of various trees. All affected landowners have been consulted and have agreed to the works as well as replanting works where agreed by the landowner. The access arrangements will be discussed and agreed with the landowners prior to any work commencing.
- Council
- Energy Consents Unit
- Reference
- ECU00006360
- Application type
- Development
- Status
- Consented
- Decision
- Permitted
- Submitted
- 15 Apr 2026
- Decision date
- 22 Jul 2026
More applications in Energy Consents Unit
Proposed operation-only Section 36 application for Parcel B (Albusia), comprising approximately 400MW of the wider 456MW Gretna Green Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Rufusia), comprising approximately 100MW of the wider 300MW Mossmorran Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Flavusia), comprising approximately 300MW of the wider 342MW Kincardine Battery Energy Storage System (BESS), granted…
Proposed operation-only Section 36 application for Parcel B (Innerwick Storage), comprising approximately 170MW of the wider 650MW Braxbess and Innerwick Storage Battery Energy…
Installation of two terminal wood poles on the existing DG 132kV overhead line, including associated conductors and downleads.
The proposed development involves reconductoring an existing overhead line located at Brevig Harbour on the Isle of Lewis. The existing line comprises seven spans of 2x32 mm2 HD…