414 applications collected
28 day camping
OGEAA7138885 Notice of intention to install fixed line broadband apparatus
Discharge of condition No. 3 (Photographic Survey) & No. 7 (Landscaping Scheme) of NP/21/0811/FUL
Construction of new portal frame workshop
Replacement two storey side extension & porch
Single storey dining room extension
Replace existing oil tank at rear of building with air source heat pump
Variation of Conditions 3 (Application for approval of reserved matters), 4 (time limits implementation), 21 (Scale parameters) and 22 (Phasing) of Planning Permission 22/0289/PA…
Alterations to shop front to remove polished stone cladding polished aluminium arch glazing and replacement with traditional timber design including pilasters and capitals, fascia…
Alterations to shop front to remove polished stone cladding polished aluminium arch glazing and replacement with traditional timber design including pilasters and capitals, fascia…
Discharge of condition No. 3 of NP/23/0618/S73 (Construction Method Statement)
Discharge of condition No. 6 of NP/25/0433/FUL - Written Scheme of Investigation (WSI)
Remove small Sycamore & Elder tree on driveway of Y Bont, Remove dead wood from Ash tree over hanging bridge & bench, remove branches of large Ash behind cottage, remove cluster…
Prune back overhanging Sycamore branches to above 5.2m, fell cluster of 3 small Ash trees to avoid debris falling onto highway
Installation of lamp post with 4G & 5G OMNI Antennas with standalone feeder pillar under Regulation 5 of the Electronic Communications Code
Remodelling of existing dwelling
Ash tree removal to stump
Reprofiling of an agricultural enclosure, with raising of ground levels with excavated soils from adjacent residential development, for agricultural improvement, together with…
Erection of a two-storey extension to an existing two-storey property, including an adjacent single-storey element with a roof terrace incorporating an air source heat pump, and…
Discharge of condition No. 3 of NP/25/0156/FUL (Landscape Management Plan)
Discharge of condition No. 6 of NP/25/0156/FUL (Precautionery Working Method Statement)
Discharge of condition No. 3 (Phasing Plan), No. 5 (Construction Traffic Management Plan), No. 6 (Radon Investigation Scheme), No. 8 (Landscaping Scheme), No. 9 (Green Roof…
Discharge of Condition 4 of NP/25/0433/FUL (scheme relating to restoration of all boundary breaches involving existing Pembrokeshire hedgebank structures)
Erection of a two-storey dwelling and a detached single-storey Garden Room annex