206 on record · mostly Southwark · 10 approved in the last 90 days · typically 42 days to a decision
Carry out work to a tree at 15 Blenheim Grove, within a conservation area.
Works to tree with a TCA: T1- Itohion Cypress and T2- Arizone Cypress to cut down/reduce the trees.
Details of condition 7 'Construction Environmental Management Plan' required by planning permission ref. 25/AP/1269 'Construction of part one to five storey building comprising B8…
Replacement of existing single glazed timber windows with double glazed timber units to match the existing style, colour & profile and replacement of rear doors with double glazed…
Details of condition 5 'Construction Logistics Plan' required by planning permission ref. 25/AP/1269 'Construction of part one to five storey building comprising B8 (Self…
Rear dormer and outrigger loft conversion with roof lights
Ground floor side infill extension, facade alterations and all associated works at 38 Hichisson Road,SE15 3AL.
Non-material amendment to planning permission 25/AP/1269 dated 09/01/2026 for 'Construction of part one to five storey building comprising B8 (Self Storage), with associated…
Convert business space into a three- or four-bedroom home, replace the shopfront and windows, rebuild a rear wall and restore a terrace.
Tree work is proposed at 29 Trafalgar Avenue, but the work is not described.
Build a first-floor extension at the rear of the house.
The application gives an address but does not describe what would change.
Notify the council that an approved development of homes, hotel studios and commercial space is starting; this notice proposes no additional work.
Confirm materials for a first-floor rear extension creating a partly enclosed roof terrace, with a mural on the west wall.
Confirm the lawful existing use of a ground-floor flat, with no building work proposed.
Construction of a rear dormer extension, upper storey addition to rear, raising of the roof ridge line and the addition of 5 roof lights to the front roof slope.
A single-storey extension will fill a gap at the rear of the house.
Tree works at Archwood House, with no details of the proposed work provided.
Tree work is proposed at Archwood House, but the work is not specified.
A glazed greenhouse will be built at first-floor level.
Variation of Condition 1 (Approved Plans) pursuant to planning permission 26/AP/2206 dated 14/10/2026 for 'Construction of single-storey ground floor rear and side extension and…
Change the pub’s ground floor and basement to flexible commercial use, with no building work specified.
Replace a church with a three-storey church and office building, roof terrace, and separate four-storey block containing four flats.
T1 English Oak. Crown reduce over-extended eastern spread over existing structure by pruning 3.5-4.5m branch lengths / spread to suitable unions to restore balanced shape. To…