122 on record · mostly Jersey · 5 approved in the last 90 days · typically 54 days to a decision
Demolish existing porch and construct new porch to East elevation.
Install 1 No. free-standing totem sign.
Remove timber fence and install glass balustrade, behind the line of the existing wall to South of the site.
REVISED PLANS to RP/2025/10448 and P/2022/1619 (Demolish existing buildings on site, excluding former military barracks. Construct 64 no. 1 bed, 69 no. 2 beds and 6 no. 3 beds…
Replace 1no door to the South Elevation.
Construct conservatory to South-West elevation.
A mural design drawn in the front of the building on Val Plaisant to include the name: Jersey Green Room Theatre company. Final design tbc designer and artist: James Carter…
Demolition of retaining boundary wall. Construct retaining boundary wall and fence.
Replace 3 No Dormer Windows & 6 No Side Cheeks to the West Elevation.
Replace 1no window ground floor to South elevation and 1no door East elevation.
Crown reduction and reshaping of existing Liriodendron tulipifera tree.
Replacement of the existing terrace roof canopy with a retractable louvred aluminium roof (Tarasola Technic Pro), incorporating sliding glazed enclosure doors and a fire escape…
Erect security perimeter fencing.
Convert first-floor offices into a two-bedroom flat.
Retain a canopy already built on the south side of the building.
Remove condition 2 from P/2024/1042 (Change of use of retail shop to part retail shop and part dog day care area.) to make the change of use permanent.
Construction of 56 no. supported housing dwellings, comprising 21 no. two-bed houses, 14no. three-bed houses, 10 no. one-bed and 11 no. two-bed Extra-Care apartments with…
Painting of a replacement mural
Demolish existing industrial building. Construct new industrial storage and distribution unit with associated bike store and parking area.
Change of use of ground and first floor premises from retail to wellness studio. Various internal alterations.
Change of use of ground floor and first floor form dental clinic to office. Excavate foundation level to create wine cellar. Various internal and external alteration .
Construct single storey extension to South elevation and convert part of garage to residential accommodation.
Replace flat roof coverings to house and dormer window.
Replace 5no. single glazed windows with 5no. double glazed windows.