939 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Details submitted for previously approved listed building works; the actual changes are not described.
Replace external brick and zinc coverings, metal roof-edge details and trims.
Remove an internal wall, replace flooring, restore glass panels above doors, install radiators, move the boiler and rearrange the bathroom.
Drainage design and flood evacuation plans submitted for an existing permission, with no new building work specified.
Landscaping, road and street furniture details submitted for the southern phase of an already approved development.
Move a rooflight and a frosted bathroom window in the first-floor rear section of the building.
Replace windows and doors throughout the building with uPVC units, and replace the front timber door with a steel door.
Replace all windows and patio or balcony doors with uPVC units, renew timber cupboard doors, and replace communal entrance doors.
Submit a wildlife improvement plan for an approved development; no building work is described.
Seek legal confirmation for replacing exterior building materials with fire-safe alternatives.
Submit evidence that an approved development meets an environmental performance standard; no building work is described.
Enlarge the loft by straightening a sloping roof end, adding roof windows, replacing windows and altering doors, external stairs and interiors.
Replacing upper-floor windows and balcony doors with uPVC, fitting timber cupboard and ventilation doors, and replacing two communal entrances with steel doors.
Replacing windows and doors throughout with uPVC units and fitting a steel front communal entrance door.
Submit details of construction machinery for the first phase of an approved development; no new building work is specified.
Submit equipment and landscaping plans for an approved development, without specifying the physical work involved.
Add a partial extra floor containing 19 additional rooms on top of a shared living block.
Install six double-glazed privacy windows across several flats, with inward-opening sections and restricted opening below 1.7 metres.
Submit approval details for a replacement development proposal; no physical building work is described.
Demolish the existing building and build a six-to-eight-storey block of flats and commercial space, with parking, play areas and landscaping.