1,321 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Cut back two ash trees to their previous pruning points to improve light and maintain tree safety.
Confirm that trial pits already excavated on site count as starting foundation work for an approved development.
Provide paving, planting and outdoor spaces around two previously approved residential towers at Elephant Park.
Install an underground tank to temporarily store rainwater, with associated drainage works.
Remove lower branches from a Lawson cypress to give three metres of clearance above ground.
Add two 75-inch digital advertising screens, one on each side of a street communications hub.
Remove an existing street communications kiosk and install a replacement Street Hub unit.
Partly demolishing an existing building and constructing six storeys of shared accommodation with communal spaces, bike storage and landscaping.
Replacing the existing rear addition with ground-floor and first-floor extensions in matching brick, including a planted roof.
Replacing the existing rear addition with ground-floor and first-floor extensions in matching brick, including a planted roof.
Reducing a walnut tree’s crown by two metres to reduce branch weight and maintain clearance around nearby property and street furniture.
Felling a dangerous lime tree and planting a replacement wild service tree.
Thinning internal growth on one side of a rear-garden oak tree and removing dead or damaged wood.
Build a single-storey side and rear extension, remove and relocate side windows, and replace a rear window with folding doors.
Repair and replace windows and alter rear door openings at a listed house.
Upgrading student accommodation with equipment rooms, replacement windows and doors, altered openings, ventilation, a new gate and an outdoor cooling unit.
Seek confirmation that adding a new covering over the existing roof is lawful.
Converting offices into a hotel with replacement windows and roof, entrance alterations and security measures.
Install illuminated lettering and a logo on the existing entrance canopy.
Upgrade student accommodation with an external equipment room, two cooling units, replacement windows and doors, and an entrance canopy with illuminated signage.