385 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Yews (G1) - Reduce in height by 1-2m and sides by 1-1.5m. Sycamore (T1) - Reduce in height by 1.5-2m, to remove dead pegs/branches and to better shape the top of the tree.
Erection of two storey rear extension
Single storey rear extension and detached garage /garden store to front of property
Unknown species - Fell.
Lawson Cypress - T1 - Damaged / broken branch to remove. Goat Willow - T2 - To remove, tree has fallen over. There is also a Plum tree - this is just to have dead wood removed…
Lime tree - T1 - to crown lift by 5m over Meeting House Road. There are 3 No False Acacia trees and a White Poplar - all to have dead wood removed with a diameter greater than…
T1 Sycamore- Removal of dead and dying limbs (See app 26/0829/TCA for T2)
Application for a non-material amendment (removal of garage and installation of high level window to home office, internal alterations and change brick garden walls to 2m high…
Demolition of existing concrete block lean-to element together with internal and external alterations to existing agricultural building to form farm office
Application under Class Q of the Town and Country Planning (General Permitted Development) Order for prior approval for change of use from agricultural barn to 3no. dwellings (C3)
Proposed installation of an EV charger to the side of property
Erection of detached garage
Proposed installation of an EV charger to the side of property
Change of use to a mixed use comprising a dwelling and aesthetician/beauty treatment use (retrospective)
Proposed changes to windows and doors and internal alterations
Erection of single storey side extension
Replacement of existing signage with 2 x non-illuminated lettering and logo applied to painted timber fascia panel
T1 Lime - Side everything (4m in length and not more than 400mm in diameter) overhanging the boundary fence up to, and including, the first major limb at approximately 18ft above…
Proposed siting of a storage container
Engineering operations to regrade the existing football field, provide a drainage basin and earth bunds plus installation of a discovery zone and associated landscaping (part…