602 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Extend the tenth-floor pavilion and revise exterior shading, landscaping, rooftop solar panels and cycle parking.
Prune a London plane tree beside the Old Deanery to clear nearby buildings and allow construction and crane access.
Prune two mulberry trees and a magnolia, reducing overgrown branches and raising the mulberry canopies.
Display two large, unlit advertisements on hoardings along St Paul's Churchyard and Creed Lane.
Replace a planned platform lift with a ramp and raised floor, and remove additional internal elements on the first floor.
Improve an eighth-floor roof terrace and install seven aluminium pergolas.
Install an outdoor platform lift with supporting works.
Install two externally lit entrance signs.
The KFC shopfront will receive new illuminated signs, repainting, a replacement entrance door and an altered window.
Landscape plans and maintenance details are being submitted, with no construction work specified.
Change the agreed refuse collection arrangements for an existing permission, with no building work proposed.
Prune a handkerchief tree and a whitebeam to keep their branches away from the building.
Prune two London plane trees away from the building and raise low branches above the roof.
Replace four telecommunications antennas and install a new 300mm dish with associated equipment works.
Install three signs: an unlit fascia sign, an illuminated projecting sign and an unlit number sign.
Design, signage and lighting documents are submitted for an already approved building project; no additional work is proposed.
A report assesses carbon emissions over an approved development’s lifetime; no building work is proposed in this submission.
A risk assessment is submitted for an already approved project; no building work is described.
A plan explains construction deliveries and site logistics for an approved project; no additional building work is proposed.
Details show rooftop equipment rooms, ventilation openings, green walls, window-cleaning equipment and fire escapes within an already approved development.