602 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Install fire-resistant glazing and partitions around the first and second floor enclosed gardens and external staircase.
An archaeological report reviews findings after excavation; no new building work is proposed.
Submit confirmation that construction machinery is registered, with no building work proposed.
Submit a travel plan for an existing planning agreement, with no building work proposed.
Submitting a construction logistics plan for an approved development, with no new building work specified.
Change the design of the sixth-floor safety railing.
Redeveloping university buildings and building student accommodation, shops and office or community space, with partial demolition, retained frontages and landscaping.
Submitting lift details for an approved development, rather than proposing new building work.
Submitting generator details for an approved development, rather than proposing new building work.
Submitting waste collection arrangements for an approved development, with no new building work specified.
Drainage details and a layout plan are being submitted for an existing permission, with no new building work specified.
A plan for archaeological investigations is being submitted, with no building work specified.
Install advertising boards, a hanging sign, individual lettering, painted signs and window graphics, with lighting for some signs.
Design details and a landscape maintenance plan are being submitted for an existing permission, with no new building work specified.
Build rooftop pavilions with toilets, landscaping and lighting, remove the existing canopy and add decorative slats to the roof structure.
Submit a report recording the existing condition of the road, with no building work proposed.
Submit an assessment of noise from building equipment, with no installation work specified.
Install an advertising board, two lit menu boards, a lit hanging sign, individual lettering and painted signs.
Add a seventh-floor rooftop building and terraces, alter the entrance and sixth floor, and provide bike parking and changing facilities.
Submit a protection plan for an already approved project; the application does not specify any new building work.