602 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
A carbon offset assessment is being submitted for an approved development; no building work is described.
Moving Antony Gormley's Resolution sculpture permanently to Holborn Circus.
Convert parts of the ground floor and basement into two homes.
Submitting exterior material details and samples for an already approved building, rather than proposing new construction.
Submitting air quality documents for an already approved development, with no new building work proposed.
Replace 37 underground parking spaces with sprinkler water tanks and equipment, with ventilation ducts to an outside lightwell.
Submit construction procurement and employment strategies for an already approved development, with no new building work proposed.
Installation and display of two non illuminated fascia signs measuring: (i) 1.80m wide and 1.00m high and located 1.00m above ground level. (ii) 1.30m wide and 0.80m high and…
Install and replace fire sprinklers across four arts centre levels, including new supply pipes and ventilation ducts.
Submit a plan for managing deliveries and servicing, with no building work proposed.
Submit an interim plan to encourage cycling, with no building work proposed.
Restoring three iron spikes above the main triangular feature at the top of Temple Bar.
Restoring three iron spikes above the main triangular feature at the top of Temple Bar.
Repairing a listed building's lead roof, gutters, drainage, masonry, timber and metalwork, and improving how rainwater drains away.
Improving how rainwater is collected and drained away, with related works.
Demolish two buildings, build student accommodation, remodel retained buildings for commercial or community use, and provide parking and landscaping.
Submit plans for local purchasing, training and recruitment linked to an existing development approval, with no building work proposed.
Submit noise details for external equipment linked to an existing planning permission, with no building work proposed.
Seek legal confirmation for office refurbishment and partial filling of a central atrium to add floor space across six levels.
Install fire-resistant glazing and partitions around the first and second floor enclosed gardens and external staircase.