613 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Design, signage and lighting documents are submitted for an already approved building project; no additional work is proposed.
A report assesses carbon emissions over an approved development’s lifetime; no building work is proposed in this submission.
A risk assessment is submitted for an already approved project; no building work is described.
A plan explains construction deliveries and site logistics for an approved project; no additional building work is proposed.
Details show rooftop equipment rooms, ventilation openings, green walls, window-cleaning equipment and fire escapes within an already approved development.
A statement explains suicide prevention measures for an already approved development; no specific building work is described.
Documents explain the design and methods for previously approved mosaic work, including protection of historic features.
Documents explain the design and methods for previously approved mosaic work, including protection of historic features.
Technical details cover window frames, roofing, rooftop equipment, solar panels and insulating glass for previously approved work to a historic building.
Details submitted for window frames, roof equipment, solar panels and insulating glass; no additional building work is specified.
Change outdoor seating hours and allow furniture to remain outside until the venue closes, without building work.
An operating plan is submitted for an already approved venue, with no building changes described.
Lift details are submitted for an already approved development; no additional building work is specified.
Alter entrances and windows, detail connections to neighbouring buildings, and clean and repair retained brick, stone and decorative frontage.
Submit material and finish samples for exterior and partly enclosed surfaces, with no new building work specified.
Drawings provide details for an already approved project; no new building work is described.
Install a single slatted ventilation panel on the outside of the eighth floor.
Submit a plan to encourage cycling; no building work is proposed.
External materials and building design details are being submitted for an approved scheme, rather than new building work.
Display seven non-illuminated hoarding signs and a printed scaffold wrap for three months.