538 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Change of use of a single dwelling house into a 3 bed House in Multiple Occupation
Remove a large mature Common Yew tree (T1) located adjacent to property's driveway. (Works to trees in a Conservation Area)
T6 Cherry - Fell to combat subsidence damage to 228 Victoria Avenue, Hull, HU5 3DZ
Remove dead Cherry tree which overhangs public footpath and could cause damage to parked cars and the public during high winds. Reference sketch1 tree location A in front garden…
The proposed erection of a replacement telecommunications base station which includes a 20-metre-high streetworks telecommunications monopole with built-in cabinet, supporting…
Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The…
The proposed erection of a replacement telecommunications base station which includes a 20-metre-high streetworks telecommunications monopole with built-in cabinet, supporting…
Non material amendment for 24/00972/FULL - Construction of a new single storey changing pavilion and a multi use playing pitch (MUGA), including associated car parking and…
Internal remodelling and introduction of ramps
Discharge of conditions for 24/00972/FULL - Construction of a new single storey changing pavilion and a multi use playing pitch (MUGA), including associated car parking and…
Works to trees
Proposed garden room
Tree works
Tree works
Discharge of conditions 17, 19, 30, 31, 35 of approval 26/00165/FULL.
Discharge of condition 9 of approval No. 25/00798/PIP.
Loft conversion and internal alterations
Discharge of conditions for 25/00891/S73 - Variation of conditions 1 (approved plans), 3 (Fume equipment), 10 (Motor cycle parking) , 13 (Tree protection), 15 (Flood Risk and…
Listed Building Consent application for the repair of a ceiling within Wilberforce House. The ceiling has collapsed / de-bonded and requires a full-scale repair.
Discharge of conditions for 25/00310/RES - Erection of 161 dwellinghouses (2, 3, and 4 bed, 2 storey) with associated infrastructure and landscaping. Ings Phase 3A, 3C, and 4…