545 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Installation of 2no. air source heat pumps to the rear of the garage
Discharge of condition 12 (Photovoltaic Panels) attached to 3/19/1237/FUL pertaining to Phase E.
Alterations and enlargement to porch roof to create pitched roof and alteration of a side door to a window.
Discharge condition 3 (archaeology) attached to 3/23/0230/HH
Discharge of condition 4 (windows) attached to listed building consent 3/25/0060/LBC
Discharge of condition 12 (Secure By Design) attached to 3/18/0432/FUL.
Conversion of outbuilding into a 1-bed self-build dwelling, incorporating the restored vinery, a ground floor extension to the south-east of the building, associated parking, air…
Demolition of existing stable/storage building, widening of existing access on to Hobbs Lane, and erection of three detached dwellings with associated garaging, parking and…
Full discharge of condition 25 (F1 - Archaeological Written Scheme of Investigation) attached to 3/19/2124/OUT (Gilston - Village 7).
Full discharge of conditions 34 (I1 - Contamination Investigation and Remediation) and 36 (I3 - Contamination Monitoring and Maintenance Plan) attached to 3/19/2124/OUT (Gilston -…
Demolition of existing lean-to and conservatory and erection of a single-storey side and rear extension; construction of a new front porch; replacement of all windows and…
Erection of stables and associated work
Change of use to wellness garden Wild Pop Up Camping during summer months
Demolition of existing store buildings and replacement with a new building, to provide stabling, replacement storage space for logs, garden machinery and tools and a chicken house.
Construction of boundary wall, installation of timber access gates and associated remedial works.
Installation of 4x externally illuminated fascia signs, 1 x externally illuminated hanging sign, 1x internally illuminated menu board, 1x opening hours board
Construction, operation and decommissioning of a solar photovoltaic ("PV") farm with associated infrastructure.
Removal of existing glazing and replacement with double-glazed fenestration
Proposed two storey, single storey and first floor rear extensions. New front porch. Alteration to the rear dormer window.
Replacing 6 Juliet balconies with new cantilever balconies (to measure 3.0 metres wide, 1200mm deep, 1200mm high). Balconies to be grey aluminium frame and glazed to the front and…