473 applications from official council records. Free to browse — paid alerts email you the ones that match your trade and area.
Approval of details for conditions 7 (design and colour of turbine), 9 (list of proposed independent noise consultants) and 10 (shadow flicker reduction) of P/24/762/FUL
Confirm the restaurant can legally trade around the clock, with no building work proposed.
Conversion of integral garage to nail salon and utility room
Convert the loft into usable rooms with projecting windows at the front and rear of the roof.
Single storey side/rear extension and conservatory
Enlarge the rear dormer, add a front dormer for another bedroom, move the front door, and alter rear doors and internal rooms.
Adapt the top floor for college use, replace windows and building services, and add boundary features and security mesh beneath the building.
Retrospective planning for the erection of a single storey outbuilding and timber fence
Proposed double extension to the rear of the property, erection of outbuilding for storage and creation of driveway and dropped kerb
Build a rear extension with both single-storey and two-storey sections.
Convert the first-floor home into additional space for the existing ground-floor daycare centre.
Submit a plan for managing environmental impacts during construction, with no additional building work proposed.
Two storey side extension
Replace the conservatory with a rear and side extension providing living space and a toilet, plus parking and a new vehicle entrance.
Change the internal layout of one building and add solar panels to an already approved development.
Reshape and landscape land into stepped levels, keeping and extending paved areas and retaining structures.
Add an upper-floor extension above an existing single-storey part of the building.
3no. Air Source Heat Pumps (ASHP) with acoustic louvre surround; 16no. outdoor AC units; new sub-station; GRP - Electrical Cabinet and associated electrical connections in…
Approval of details for condition 13 (Demolition and Construction Environmental Management Plan) of P/25/417/FUL
3no. Air Source Heat Pumps (ASHP) to be sited on the east side and serving the main school building within an acoustic enclosure; 2no. domestic sized ASHP to be sited on the west…