Full planning for engineering operations associated with infrastructure requirements and service provision for the detailed Phase 1…
Berewood Phase 1 Hambledon Road Denmead Hampshire
Official description
Full planning for engineering operations associated with infrastructure requirements and service provision for the detailed Phase 1 application, the temporary closure of Havant Footpath No 11 and Southwick and Widley Footpath No 30, with suitable alternative route provided.
- Council
- Winchester
- Reference
- 25/00793/PTH
- Application type
- Footpath Application
- Status
- Current
- Submitted
- 8 May 2025
More applications in Winchester
Trim overhanging branches from one tree by about two to two-and-a-half metres to improve its shape and safety.
Cut back branches on five lime trees by two to three metres where they overhang neighbouring rear gardens.
Prune four trees around a lamppost to improve lighting and allow maintenance access.
Standing with your back to the northside of Linnets Cottage there are 5 Beech trees in a row 2 of which on the right (T4 & T5) in the row appear (due to their much broader…
Application to discharge the following conditions of 26/00184/FUL; condition 3 (CTEMP), condition 4 (Arboricultural Method Statement), condition 6 (Habitat Management and…
A single storey rear extension