Retain completed alterations providing four en-suite bathrooms, incorporating an existing bathroom into bedroom space, treating basement damp and repairing plaster.
14 Stepney Green, London, E1 3JU, 14
Trades this could involve
Official description
Retention of Listed Building Consent works for internal alterations including creation of four en-suite bathroom facilities, Incorporation of the existing first-floor bathroom into bedroom accommodation to form an ensuite, Associated plumbing, drainage and bathroom services, Damp remediation to the basement/lower-ground-floor accommodation, Repair of defective internal plaster, and Skimming and making-good of internal surfaces.
- Council
- Tower Hamlets
- Reference
- PA/26/01581/NC
- Application type
- Listed Building Consent
- Status
- Application Under Consideration
- Submitted
- 14 Sep 2026
More applications in Tower Hamlets
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.
Install hanging and wall signs, menu cases, chalkboards, timber fascia signs and four floodlights.