Refurbishing the building, restoring sash windows, adding a rear extension, altering a boundary wall, replacing a gate and installing two heat pumps.
7 Pier Head, Wapping High Street, London, E1W 1PN
Trades this could involve
Official description
Comprehensive refurbishment of existing building, including internal and external restoration works. Replacement and part replacement of timber sash windows, including installation of slim double-glazed units. Erection of single storey lower ground rear extension. Alterations to existing boundary wall to communal passage at lower ground level. Replace existing external gate to communal passage. Installation of two air source heat pumps on the existing area of flat roof.
- Council
- Tower Hamlets
- Reference
- PA/26/01358/NC
- Application type
- Householder Planning & Listed Building Consent
- Status
- Application Under Consideration
- Submitted
- 11 Aug 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.