Install heating, cooling and ventilation equipment on the roof, at ground level and within walls, with safety rails and an access ladder.
Create Day Centre, 35 Ronald Street, London, E1 0DT
Trades this could involve
Official description
Installation of a new heating, cooling and ventilation system including 1 no. roof-mounted mechanical ventilation and heat recovery (MVHR) unit with associated pipework, ducting, guard rail system and fixed access ladder; 3 no. floor mounted air condenser units at ground level (including 2 no. replacement units); and 2 no. heat recovery ventilation units within the external walls at ground level.
- Council
- Tower Hamlets
- Reference
- PA/26/01197/NC
- Application type
- Full Planning Permission
- Status
- Approved
- Decision
- Approved
- Submitted
- 14 Jul 2026
- Decision date
- 21 Sep 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.