Replacing combustible external cladding and glass panels with safer materials, matching the existing appearance and reinstating bricks where needed.
Flats 1 to 71 Odd, Epping Close, London E14 9WG and Flats 2 to 72 Evens, Sherwood Gardens, London, E14 9WN
Trades this could involve
Official description
Proposed cladding remediation works to remove combustible cladding elements and replace them with materials and systems of limited combustibility and non-combustible materials: Reinstate bricks (if necessary). Remove and replace the curtain wall glass infill panels with single/double glass infill panels and aluminium infill panels, matching the existing.
- Council
- Tower Hamlets
- Reference
- PA/26/01005/NC
- Application type
- Full Planning Permission
- Status
- Approved
- Decision
- Approved
- Submitted
- 24 Jun 2026
- Decision date
- 11 Aug 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.