Converting an office building into a hotel, adding two floors, replacing external cladding and installing new building equipment.
120 Leman Street, London, E1 8EU
Trades this could involve
Official description
Recladding refurbishment and extension of the building to include an additional two floors of accommodation in connection with a change of use from office (class E) to hotel (Class C1) use, and introduction of associated new plant and equipment, and related works.
- Council
- Tower Hamlets
- Reference
- PA/26/00996/NC
- Application type
- Full Planning Permission
- Status
- Refused
- Decision
- Refused
- Submitted
- 1 Jul 2026
- Decision date
- 30 Sep 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.