Install temporary entrance gates, metal access ramps, timber boarding and soundproof enclosures for up to three years.
Wapping Hydraulic Power Station, Wapping Wall, London, E1W 3SG
Trades this could involve
Official description
Demountable, temporary and time limited works for a period of up to 3 years comprising the installation of new entrance gates; the installation of free-standing metal ramps to provide step-free access to the Turbine Hall and Filter House entrances; the installation of a painted timber hoarding to the Accumulator Tower opening, and; the installation of acoustic enclosures to the openings between the Boiler House and Filter House.
- Council
- Tower Hamlets
- Reference
- PA/26/00920
- Application type
- Full Planning & Listed Building Consent
- Status
- Approved
- Decision
- Approved
- Submitted
- 26 May 2026
- Decision date
- 3 Aug 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.