Excavate and carry out preparatory works for a hotel refurbishment, including changes to the basement and lifts.
42 Adler Street, London, E1 1EE, 42
Trades this could involve
Official description
Excavation and Minor enabling works to in connection with the refurbishment of the existing hotel, including alterations to basement and lifts and associated works.
- Council
- Tower Hamlets
- Reference
- PA/26/00488/NC
- Application type
- Full Planning Permission
- Status
- Approved
- Decision
- Approved
- Submitted
- 18 Mar 2026
- Decision date
- 29 Jun 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.