Submission of details for the discharge of Condition 3b (Plant Compliance -a post installation verification report) from planning…
106 Brick Lane, London, E1 6RL
Official description
Submission of details for the discharge of Condition 3b (Plant Compliance -a post installation verification report) from planning permission PA/25/00816 dated 22/07/2025.
- Council
- Tower Hamlets
- Reference
- PA/25/02220/S
- Application type
- Approval Of Details Reserved By A Condition (Discharge)
- Status
- Approved
- Decision
- Approved
- Submitted
- 22 Dec 2025
- Decision date
- 24 Mar 2026
More applications in Tower Hamlets
A plan explaining delivery and servicing arrangements has been submitted; no building work is proposed.
Allow part of the twenty-ninth floor to be used for education or as offices, with no building work specified.
Replace six windows with timber casements and refurbish four sash windows, all with slim double glazing.
Replace a substation enclosure with a brick bin and cycle store, adding timber ventilation doors and removing a kerb for level access.
Changing an access agreement to restrict public opening hours while keeping round-the-clock resident access through fob-controlled gates.
Demolish a vehicle ramp, build a new deck across Westferry Road, and add stairs on Bank Street with surrounding landscaping.