Formal submission In accordance with Requirement11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024 (the Order)…
Bramford to Twinstead
Official description
Formal submission In accordance with Requirement11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024 (the Order), National Grid are formally submitting the access designs for AB-AP16 which is on Clay Lane and is within Stage 3.2 of the authorised development.
- Council
- Suffolk
- Reference
- SCC/0171/26
- Application type
- Discharge Of Requirements (Bramford To Twinstead)
- Status
- Application Validated
- Submitted
- 9 Oct 2026
More applications in Suffolk
Submission seeking advice on Requirement XX – Management Plan for Stage ZZ
Discharge of Requirement 36(1) Port Traffic, Lowestoft Port Construction Traffic Management Plan Sscoping Letter
Formal Submission, Schedule 3, Requirement 11(1) – Access Design AB-AP16 - STAGE 3.2
Construction of a covered digestate storage lagoon, including associated underground pipeline, access track and ancillary infrastructure, to support the existing anaerobic…
Formal Submission - Requirement 11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024 (the Order), we are formally submitting the access designs for E-DAP3…
Formal Submission - Discharge of Requirement 11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024 (the Order), we are formally submitting the access designs…