← Back to the live feed

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising:…

Land Intersecting The B4102 Meriden Road And The River Blythe, To The North Of Patrick Farm

Official description

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Structures - Provision of a ditch crossing slab around the northern end of Patrick Cutting and Embankment (both consented separately - SMBC planning reference: PL/2025/00285/HS2DIS); earthworks - Engineering earthworks to form the toe of two adjoining embankments; engineering earthworks to form a maintenance access strip (MAS), a maintenance access track (MAT) and associated ford crossing at northern end of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); engineering earthworks to form drainage ditches, including a drainage ditch incorporating a concrete drop-inlet cascade around the northern end of Patrick Cutting and Embankment (both consented separately - planning reference: PL/2025/00285/HS2DIS), extending beneath the southern extent of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); earthworks to create part of a layby, partially consented under Patrick Cutting and Embankment (both consented separately - SMBC reference: PL/2025/00285/HS2DIS); fences and walls - Provision of Vehicle Restraint Systems (VRS), located south of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); provision of boundary and security fencing with access gates.

Council
Solihull
Reference
PL/2026/01818/HS2DIS
Application type
Hs2 Section 17 (Dis)
Status
Awaiting Decision
Submitted
5 Oct 2026
View the official council record

More applications in Solihull