To run overhead line between North of Kergord Converter Station running generally parallel to the A970 before passing Voe and running…
Northern Shetland 220kV To Kergord 132kV
Official description
To run overhead line between North of Kergord Converter Station running generally parallel to the A970 before passing Voe and running alongside the A968 towards the Toft / Scatsta area.
- Council
- Shetlands
- Reference
- 2025/279/ECUCON
- Application type
- Energy Consents Unit
- Status
- Pending Consideration
- Decision
- Conditions
- Submitted
- 27 Oct 2025
- Decision date
- 30 Oct 2025
More applications in Shetlands
Application for consent, agreement or approval required by planning Condition: 07(Junction Drainage) of planning application 2026/203/PPF.
Application for consent, agreement or approval required by planning Condition 3: Lighting of planning application 2026/148/DCON1
Replace existing glazing in conservatory with double-glazed units, incorporating toughened safety glass, new hardwood frames and revised opening mechanism.
Application for consent, agreement or approval required by planning Condition: 3 (NID) of planning application 2023/084/VCON
Erection of single storey dwellinghouse with ASHP, formation of vehicular access, erection of 1m post and wire boundary fence and associated landscaping and drainage works.
Install 18no. black glass solar panels on (wooden) framework within the front curtilage of the dwellinghouse.