Remove dead branches from trees, reduce four lime trees and prune a rear sycamore around a residential block.
North Court, Clevedon Road
Official description
T1. Sycamore Tree Front/Northwest Corner of Block: Remove dead branches throughout the crown area that are over 2.5cm in diameter, and inspect the crown for any adverse conditions. The tree's current height is 16m, and its crown spread is 7m After the proposed works, the tree's height is 16m, and the crown spread is 7m T2. False Acacia Front/west of Block: Minor Bark Damage. Remove dead branches throughout the crown area that are over 2.5cm in diameter, and inspect the crown for any adverse conditions. The tree's current height is 12m, and its crown spread is 4m After the proposed works, the tree's height is 12m, and the crown spread is 4m G3. European Lime x 4 Front/West of Block: Reduce height by 2.5m and lateral spread by 1m to a rounded natural form. Reduce all branches to clear the property elevation by up to 2m. Lift the canopy to 5/6m above ground level. Remove dead branches throughout the crown area that are over 2.5cm in diameter, and inspect the crown for any adverse conditions. The tree's current height is 14m, and its crown spread is 6m After the proposed works, the tree's height is 11.5m, and the crown spread is 5m T4. Sycamore Tree Rear/South of Block: Reduce new growth to previous reduction points (3m), retaining good growth furnishings to support crown development, ensuring a clearance of 3m from property elevation. Remove dead branches over 2.5cm in diameter. Inspect the crown for adversities and advise if necessary. The tree's current height is 16m, and its crown spread is 9m After the proposed works, the tree's height is 13m, and the crown spread is 6m
- Council
- Richmond
- Reference
- PA26/3512
- Application type
- Tree Works: Trees In Conservation Areas/Subject To Tpos
- Status
- Comment Issued
- Decision
- Comment Issued
- Submitted
- 14 Oct 2026
- Decision date
- 4 Nov 2026
More applications in Richmond
Construction details and a work method are being submitted for previously approved works; no specific building changes are described.
Construction details and a work method are being submitted for previously approved works; no specific building changes are described.
Parking permit and construction management details for previously approved works.
A rear extension has been built 43 centimetres deeper than approved, bringing its total depth to 3.43 metres.
Details are being submitted to meet a previous planning requirement, with no specific building work described.
Replace the rear extension and reshape the roof, adding two dormers, windows, rooflights, a bin store and heat pump enclosures.