Request to discharge Requirement 22 (Cattle Creep Underbridge) of Stage 4 and Works Numbers 1B (the works comprise the installation of a…
Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol
Official description
Request to discharge Requirement 22 (Cattle Creep Underbridge) of Stage 4 and Works Numbers 1B (the works comprise the installation of a new concrete saddle over the arch barrel, and the reinstatement of formation to track level, along with masonry works to the underside of the bridge, including the abutments and wingwalls. There will be new coper stones placed on top of the wing walls and the bridge parapets) of the Portishead Branch Line (MetroWest Phase 1) Order 2022
- Council
- North Somerset
- Reference
- 26/P/2130/DCW
- Status
- Registered
- Submitted
- 15 Oct 2026
More applications in North Somerset
Certificate of Lawfulness for the change of use of land to a mixed use as a storage area (Class B8) and a parking area (sui generis); and engineering operations comprising of the…
Certification of Lawful Development for the relocation of existing stone wall to create 2 new parking bays using permeable material.
Certificate of Lawfulness for the use of existing Annexe as a separate dwelling.
Application to determine if prior approval is required for the erection of a single storey rear extension with a pitched roof that would 1) extend beyond the rear wall of the…
Notification under Regulation 5 of the Electronic Communications Code of the intention to install Electronic Communications Apparatus at an existing Telecommunications site. Works…
Permission in Principle for the erection of up to 5no. dwellings