Details to be partially agreed in associated with condition 65 (External Lighting) of application P2024/0711 - Full planning permission for…
Land At Port Talbot Steelworks Port Talbot
Official description
Details to be partially agreed in associated with condition 65 (External Lighting) of application P2024/0711 - Full planning permission for the demolition of existing buildings and structures, partial infill of the BOS lagoon, and construction of a new electric arc furnace-based steel production facility (1 no. arc furnace, 2 no. ladle furnaces). The development includes chemical/material storage and transfer infrastructure, pipework and cabling (above and below ground), buildings, fume and dust treatment plant, water treatment facility and material handling systems, electrical control rooms and power infrastructure, offices and ancillary facilities, together with new and amended roads and rail lines, landscaping and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations. Outline planning permission (with all matters reserved except for access and landscaping) for the construction of a scrap metal handling facility and associated scrap yards, scrap processing facility, new substation, underground and overground electrical infrastructure, and new and amended roads and rail lines, landscape and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations - granted on 07/03/25.
- Council
- Neath
- Reference
- P2026/0666
- Application type
- Discharge Of Conditions
- Status
- Awaiting Decision
- Submitted
- 14 Oct 2026
More applications in Neath
Works to one Lime tree protected by Tree Preservation Order No. T345 comprising of the following: -Crown reduction of approximately 6 metres, reduction of the two lower limbs to…
Non-material Amendment to amend wording of conditions 2 (Approved Plans), Condition 15 (Construction Environmental Management Plan) and Condition 17 (Piling Strategy Controls) of…
Retrospective application for siting a parcel locker
Proposed alterations to existing dormer, including a reduction in width to achieve a 300mm inset from the gable end and the construction of a new gable end.
Proposed Engineering Operations including bund formation and ground scrapes to facilitate Ecological Habitat Creation.
Prior Notification Application under Schedule 2 Part 31 for the proposed demolition of the concrete slab present on site.