Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017:…
Mynydd Forch Dwm Windfarm Tonmawr Neath
Official description
Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017: Provision by National Grid Electricity Distribution of a new 33 kV connection comprising an underground cable route of approximately 10 km from Briton Ferry Substation to Mynydd Fforch-Dwm Wind Farm (DNS/3255801).
- Council
- Neath
- Reference
- P2026/0607
- Application type
- Screening Opinion
- Status
- Awaiting Decision
- Submitted
- 5 Oct 2026
More applications in Neath
Works to one Lime tree protected by Tree Preservation Order No. T345 comprising of the following: -Crown reduction of approximately 6 metres, reduction of the two lower limbs to…
Non-material Amendment to amend wording of conditions 2 (Approved Plans), Condition 15 (Construction Environmental Management Plan) and Condition 17 (Piling Strategy Controls) of…
Retrospective application for siting a parcel locker
Proposed alterations to existing dormer, including a reduction in width to achieve a 300mm inset from the gable end and the construction of a new gable end.
Proposed Engineering Operations including bund formation and ground scrapes to facilitate Ecological Habitat Creation.
Prior Notification Application under Schedule 2 Part 31 for the proposed demolition of the concrete slab present on site.