DNS EIA scoping consultation: Gwynt Glas Offshore Wind Farm a large-scale floating offshore wind energy project
42km Off SW Coast Of Pembrokeshire
Official description
DNS EIA scoping consultation: Gwynt Glas Offshore Wind Farm a large-scale floating offshore wind energy project
- Council
- Neath
- Reference
- P2026/0421
- Application type
- Scoping Opinion
- Status
- Decided
- Decision
- Permitted
- Submitted
- 29 Jun 2026
- Decision date
- 17 Jul 2026
More applications in Neath
Details submitted pursuant to condition 5 (EV charging scheme) of planning permission P2024/0668 dated 21.01.2025 (for 25 car parking spaces and a coach parking bay)
Works to one Lime tree protected by Tree Preservation Order No. T345 comprising of the following: -Crown reduction of approximately 6 metres, reduction of the two lower limbs to…
Non-material Amendment to amend wording of conditions 2 (Approved Plans), Condition 15 (Construction Environmental Management Plan) and Condition 17 (Piling Strategy Controls) of…
Retrospective application for siting a parcel locker
Proposed alterations to existing dormer, including a reduction in width to achieve a 300mm inset from the gable end and the construction of a new gable end.
Proposed Engineering Operations including bund formation and ground scrapes to facilitate Ecological Habitat Creation.