Build 12 wind turbines with access roads, a substation, underground cables, drainage and landscape restoration.
Scout Moor Wind Farm Rochdale
Trades this could involve
Official description
Observations to Neighbouring LPA: Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm.
- Council
- Hyndburn
- Reference
- 11/26/0427
- Application type
- Observations To Neighbouring Lpa
- Status
- Decided: No Response
- Decision
- Permitted
- Submitted
- 17 Sep 2026
- Decision date
- 2 Oct 2026
More applications in Hyndburn
Advertisement Consent: Display of 1no. internally illuminated digital screen
Full: Replacement of 10No. UPVC Windows to north and west elevations, including 2No. aluminum framed fire rated window to improve existing first floor escape provision
Discharge of Conditions: 5 (Material Samples), 6 (Velux Roof Light Details), 12 (Bin Details), 16 (Bird and Bat Box Details), 17 (Owl Box Details), 21 (Construction Method…
Build an agricultural storage building for farm machinery.
Full: Demolition of existing buildings and erection of 14no. commercial and business units (Use Class B8) \with associated infrastructure
Advertisement Consent: Installation of four Directional signs