A small energy storage facility will be built and operated.
Verge at Castleham Road, St Leonards-on-sea
Trades this could involve
Official description
Construction and operation of a micro energy storage project consisting of a 200kW (800kWhr) Energy Storage System (ESS) (known as a 'Battery Box').
- Council
- Hastings
- Reference
- HS/FA/26/00503
- Application type
- Full Planning Permission
- Status
- Decided
- Decision
- Permitted
- Submitted
- 27 Aug 2026
- Decision date
- 20 Oct 2026
More applications in Hastings
Request for screening opinion under Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - Demolition and Site Clearance works and mixed-use redevelopment…
Proposed replacement of existing interlocking concrete roof tiles with natural slate coverings, replacement of existing asphalt flat roof and valley gutter linings with lead, and…
Proposed replacement of existing interlocking concrete roof tiles with natural slate coverings, replacement of existing asphalt flat roof and valley gutter linings with lead, and…
Application for a Certificate of Lawful Use as a single dwellinghouse
Application for a Certificate of proposed Lawful development for the erection of a front entrance porch
Single storey rear extension with alterations to windows on north elevation